-
entirety of Line 2 (Cawang–Bekasi Timur), part of Line 1 (Cibubur–Cawang–
Baranangsiang) and Line 3 (Cawang-Dukuh Atas-Senayan). The
first phase will cost 11...
-
Indonesian name Area (km2) Po****tion (2022)
Density (P/Km²)
Baranangsiang Village Kelurahan Baranangsiang 2.71 28,440 10,495
Katulampa Village Kelurahan Katulampa...
-
Cibubur Line
extension TBD -
Dukuh Atas
Senayan Jati
Mulya KAI(LRT Division)
Harjamukti Baranangsiang Bekasi Line
extension TBD -
Dukuh Atas Soekarno-Hatta...
- 2021.
Second phase will
extent the
first phase lines: Cibubur-Bogor
Baranangsiang,
Dukuh Atas-Palmerah-Senayan, and Palmerah-Grogol. The construction...
-
Transportation Locale Jakarta, West Java
Termini Dukuh Atas
Harjamukti Baranangsiang (phase 2)
Stations 12
Service Type
Light rapid transit System Jabodebek...
-
cities of West Java (330 buses).
There are two
major bus terminals,
Baranangsiang and Bubulak. The
former has an area of 22,100 m2 and is
dedicated to...
-
Traffic Directorate of
Transport Jabodetabek Transport Servicing Stations Baranangsiang Terminal,
Bogor Jatijajar Terminal,
Depok Pondok Cabe Terminal, South...
- in
Bogor since 15
April 2023,
details address is as follow:
Komplek Baranangsiang Indah,
Jalan Jaltiluhur C8 No. 9B RT.06/RW.04. Katulampa,
Bogor Timur...
- JIRR│Jakarta-Cikampek Toll Road
Jagorawi Toll Road TM TMII
Jagorawi Toll Road│JORR KR
Kampung Rambutan CI
Ciracas HM
Harjamukti planned extension to
Baranangsiang...
- 2020.[permanent dead link] "Jadi
Pusat Terminal, Se**** Rute Bus di
Baranangsiang Bakal Dipindah".
AyoBogor (in Indonesian). 6
August 2019. Retrieved...